Hear from Our Customers
Your driveway stays rich black instead of fading to gray. Cracks don’t spread into expensive repairs. Water rolls off instead of seeping in and freezing.
That’s what happens when you seal your driveway before Long Island’s winter hits. You’re not just maintaining appearance—you’re preventing the kind of damage that costs thousands to fix later.
Most Yaphank homeowners wait until they see problems. Smart ones protect their investment before the damage starts.
We’ve been protecting driveways across Suffolk County for years. We understand what salt air and harsh winters do to asphalt around here.
We’re not the cheapest option—and that’s intentional. You’re investing in commercial-grade sealers, proper surface preparation, and contractors who return your calls when you need us.
Licensed and insured with a satisfaction guarantee. We live and work in the same communities we serve.
First, we clean your driveway completely. Oil stains get treated, debris gets removed, and we blow out all the cracks. This step matters because sealer won’t bond properly to dirty surfaces.
Next comes crack filling. We use hot rubberized crack filler for anything larger than hairline cracks. No shortcuts here—cracks that aren’t properly filled will show through the new sealcoat within months.
Then we apply commercial-grade sealer using professional equipment. Two thin coats work better than one thick application. The sealer needs 24-48 hours to cure properly, depending on weather conditions.
Ready to get started?
Complete surface preparation including power washing and debris removal. Hot rubberized crack filling for cracks over 1/2 inch wide. Commercial-grade sealer application with professional equipment.
In Yaphank, we see driveways damaged by everything from snowplow scraping to salt corrosion. Our sealcoating process addresses the specific challenges Long Island homeowners face.
We also handle oil stain treatment and minor patching when needed. The goal is a driveway that looks great and lasts through multiple winter seasons without premature wear.
Most Yaphank driveways should be sealed every 2-3 years under normal conditions. However, Long Island’s harsh winters can shorten that timeline.
If your driveway gets heavy snowplow use or you park multiple vehicles daily, you might need sealing every 18-24 months. Driveways that face south and get more sun exposure typically last longer between applications.
The key is watching for signs like fading color, small cracks appearing, or water soaking in instead of beading up. Waiting until you see major problems means you’ve waited too long.
Late spring through early fall works best for driveway sealing in Yaphank. We need temperatures above 50 degrees and no rain in the forecast for at least 24 hours.
Many homeowners schedule sealing in late summer or early fall to protect their driveways before winter arrives. This timing gives the sealer maximum curing time before facing salt and snow.
Avoid sealing during humid periods or when temperatures fluctuate dramatically. The sealer needs stable conditions to cure properly and provide lasting protection.
Plan on staying off your driveway for 24-48 hours after sealing, depending on weather conditions. Hot, dry, breezy days mean faster curing, while cool or humid conditions take longer.
You can usually walk on the sealed surface after 4-6 hours, but car tires will leave permanent marks if you drive on it too soon. The sealer might look dry on top but still be soft underneath.
We’ll give you a specific timeline based on the weather forecast when we finish your job. It’s better to wait an extra day than have tire marks permanently embedded in your new sealcoat.
Yes, but the approach depends on your driveway’s age and condition. New asphalt should cure for 6-12 months before first sealing to allow natural oils to evaporate.
Older driveways that have never been sealed often need extra preparation work. Years of weathering can leave the surface oxidized and porous, requiring primer or multiple sealer applications.
We’ll assess your specific situation during the estimate. Sometimes a driveway that’s been neglected for years needs repairs before sealing will be effective.
Poor surface preparation and cheap materials cause most sealcoating failures. Many contractors skip proper cleaning or use watered-down sealer to cut costs.
Long Island’s salt and freeze-thaw cycles are particularly hard on inferior sealers. Hardware store products and diluted materials simply can’t handle our climate conditions.
We use commercial-grade sealers designed for harsh climates and never skip surface prep steps. Proper preparation and quality materials mean your sealcoat lasts through multiple winter seasons.
Absolutely. Small cracks turn into major problems fast when water freezes and expands inside them. What starts as a hairline crack can become a pothole after one harsh winter.
Crack sealing should happen before temperatures drop consistently below freezing. Once water gets into cracks and freezes, the damage accelerates rapidly throughout winter.
We recommend addressing any cracks larger than 1/4 inch before sealing. Proper crack filling creates a waterproof barrier that prevents freeze damage and extends your driveway’s life significantly.